Home construction in Bangalore - residential site under construction by Pallavi Constructions
Home Construction in Bangalore

We Build the House, Then We Finish the Inside.

Pallavi Constructions is a construction and interior designer in Bangalore with over ten years on site. Your civil work and your interiors sit on one contract, with one completion date and one person you call when you have a question. No handing you from a contractor to a carpenter to a designer who has never seen your plot.

  • 0years building in Bangalore
  • 0projects handed over
  • 0sq ft completed
  • 0average Google rating
scroll
  • A written rate cardLine by line, brand by brand, handed to you before you pay anything.
  • An engineer with a nameOne person owns your site, visits it daily and picks up when you call.
  • Site photos every SaturdayDated photos and a short note, whether you live in the city or not.
  • A date inside the contractYour completion date is signed on paper, not promised on a phone call.

WHERE WE TAKE UP RESIDENTIAL CONSTRUCTION IN BANGALORE

WhitefieldSarjapur RoadHSR LayoutElectronic CityJP NagarJayanagarBannerghatta RoadKanakapura RoadYelahankaHebbalRajajinagarDevanahalliMarathahalliHoskoteVidyaranyapuraNagasandra WhitefieldSarjapur RoadHSR LayoutElectronic CityJP NagarJayanagarBannerghatta RoadKanakapura RoadYelahankaHebbalRajajinagarDevanahalliMarathahalliHoskoteVidyaranyapuraNagasandra
Pallavi Constructions engineer reviewing drawings at a Sarjapur Road house site site / Sarjapur Road  ·  week 22
ABOUT US

Strong foundations for a strong future

Most people building a house in Bangalore end up managing the project themselves.

Four parties, four excuses, and an owner doing the coordination on weekends. A contractor for the civil work. A carpenter for the interiors. An electrician who answers on alternate days. A designer who has never stood on the site. Work falls through the gaps between them, and the gaps are exactly where your money goes.

Pallavi Constructions was set up to close those gaps. In more than ten years of home construction in Bangalore, our civil team and our interior team have always sat in the same office and worked off the same drawing set. That is why the plumbing points match the vanity, the false ceiling matches the light plan, and nobody breaks a finished wall to run a pipe someone forgot.

The same team also handles commercial and industrial work — retail floors, clinics, office buildings and small factories — so the planning discipline that comes from a project with a launch date carries straight into the house we build for you.

  • 01One contract, not fourCivil work and interiors on a single agreement with a single completion date.
  • 02An engineer with a nameOne person owns your site, visits daily, and answers the phone himself.
  • 03Photos every weekDated site photos with a short note on what moved. Useful when you are not in the city.

PALLAVI CONSTRUCTIONS  /  BENGALURU  /  CONSTRUCTION & INTERIOR DESIGN

SERVICES

What we build, and what we design

Take the whole package or just the part you need. The drawings and the rate card work the same either way.

  • Residential house construction in Bangalore by Pallavi Constructions
    01 / most asked for

    Residential construction

    Independent houses, duplexes and small apartment blocks. Soil test, drawings, BBMP or panchayat sanction, structure, finishing and handover — all on one agreement, with one team answerable for it.

    soil test to keysBBMP drawingspackage rates
    Get a rate for my plot
  • Turnkey home interior design work in Bangalore
    02

    Turnkey home interiors

    Layout, false ceiling, lighting, wardrobes, wall finishes and furniture, delivered as one job with 3D views approved before anything is cut.

    3D firstsingle quote
    See interior packages
  • Commercial construction project under way in Bangalore
    03

    Commercial construction

    Retail floors, clinics, office buildings and small factory units, built to a programme you can plan a launch date around.

    Discuss my project
  • Modular kitchen and wardrobe work in Bangalore
    04

    Modular kitchens & wardrobes

    Built to your measurements in factory conditions, with hardware brands you can look up and a written warranty on the carcass.

    Get a kitchen quote
  • Home renovation and remodelling work in Bangalore
    05

    Renovation & remodelling

    New bathrooms, rewiring, waterproofing, floor changes and extra rooms — phased so you can keep living there wherever possible.

    Book a site check
  • Architectural and structural drawing work for a Bangalore home
    06 / start here if you are still deciding

    Architecture, drawings and 3D design

    Floor plans, elevations, structural drawings and a 3D walkthrough. Take the set to any builder you like, or let us build what we drew. Either way, the drawings are yours.

    working drawings3D walkthroughvaastu on request
    Start with drawings
STAGES

How a project runs with us

The same five stages every time, in the same order. You always know which stage you are in and what has to happen before the next one starts.

  1. 01

    Site visit and an honest talk

    We come to your plot or flat, measure it, and tell you what the site allows and what it will realistically cost.

    free · within 48 hrs
  2. 02

    Design and estimate

    Floor plans, 3D views and a line-by-line cost sheet. You change things here, on paper, where changes are cheap.

    7–10 days
  3. 03

    Agreement and drawings

    Scope, rates, payment stages and the handover date in one agreement, with the working drawing set attached.

    before any payment
  4. 04

    Build and finish

    Structure, then services, then interiors. Weekly photos, a named engineer, and payments released only against work already done.

    tracked weekly
  5. 05

    Handover and warranty

    We walk the property with you, clear the snag list, hand over bills and warranty papers, and stay reachable afterwards.

    +30-day snag window
Finished living room by an interior designer in Bangalore with false ceiling and cove lighting
oak slate bone walnut graphite concrete
INTERIOR DESIGN

An interior designer in Bangalore who joins before the plaster dries

Our interior team comes in at drawing stage, not after possession. That is the only reason switchboards land where the furniture actually goes, and the false ceiling fits the light plan instead of fighting it. If you already own a flat, the interiors run as a standalone job on exactly the same terms.

  • Space planning and 3D views
  • False ceiling and cove lighting
  • Modular kitchen and utility
  • Wardrobes, lofts and storage
  • TV and crockery units
  • Wall panelling, texture and paint
  • Flooring, tiles and dado
  • Curtains, blinds and soft furnishing

Already own a flat? Interiors run on the same published rate card and the same written handover date. Loose furniture and appliances stay yours to buy.

See interior rates
WHY CHOOSE US

Building is stressful because of the unknowns, not the bricks

Six unknowns cause almost every argument on a construction site. We have removed all six, and the card beside this is what that looks like on an ordinary Saturday morning.

  • UNKNOWN 01“What will it actually cost?”A line-by-line estimate before work starts, with brand, quantity and rate against every item. Our full rate card is published further down this page.
  • UNKNOWN 02“Who do I call about this?”One engineer owns your project from start to finish, visits site daily and takes your calls. You are not passed between three numbers.
  • UNKNOWN 03“Is anything happening today?”Dated photos every week with a short note on what moved and what is next. Many of our clients live abroad or in another city.
  • UNKNOWN 04“Is that the material I paid for?”Cement, steel, wiring, plumbing and hardware come from named brands, and the supplier bills come to you. Nothing is swapped quietly.
  • UNKNOWN 05“Why is my wall being broken?”Electrical points, plumbing lines and ceiling levels are fixed while the slab is still on paper, because the interior team is already in the room.
  • UNKNOWN 06“When can I move in?”A completion date sits inside the agreement with a snag-clearing period after it. We plan the programme backwards from the day you want the keys.
SR Suresh R. · site engineerSarjapur Road · Saturday, 9:12 am
Dated weekly site photo showing first floor slab work in progress week 22  ·  first floor slab
First floor slab poured on Thursday
  • Slab cast Thursday morning, curing started the same evening
  • Cube test samples taken, report due in 7 days
  • Conduits laid before the pour, as per your revised light plan
  • Next week: deshuttering, then blockwork on the first floor

Stage 4 payment falls due after deshuttering. Nothing is requested until you have seen it.

OUR WORK

Projects we have handed over

Drag the handle to watch one project go from bare structure to a finished room. Tap any photo below to open it larger.

3BHK Whitefield project after handover - finished living and dining interior 3BHK Whitefield project during construction, before interiors during build handed over

3BHK, Whitefield

We built the structure and then did the interiors, so ceiling levels, light points and wardrobe depths were settled together at drawing stage. Nothing had to be chiselled open afterwards.

PackageStandard + interiors
Built area2,150 sq ft
Duration11 months
Handover2 weeks early
REVIEWS

The review that counts is the one written in month nine

4.8

★★★★★

Google reviews · Bengaluru
  • ★★★★★

    We were in Dubai for most of the build. The Saturday photos and the video walk before each payment meant we never once felt out of the loop. The house was ready two weeks before the date in the agreement.

    Sandeep K.4BHK house, Sarjapur Road · Standard + interiors

  • ★★★★★

    The published rate card is what sold me. I held it against two other quotes and found out one of them was quietly using a cheaper cement. That comparison saved me more than the price difference.

    Ananya R.3BHK interiors, Whitefield · turnkey fit-out

  • ★★★★★

    Our old Jayanagar house had leakage in three rooms. They opened it up, showed me the cause before quoting, and finished the waterproofing and new flooring in six weeks flat.

    Vikram S.Duplex renovation, Jayanagar · waterproofing + flooring

  • ★★★★★

    The kitchen is the part I use every day and it is the part they got most right. They measured twice, and the hardware brands were exactly what was written in the quote.

    Meera I.Modular kitchen, HSR Layout · interiors only

PRICING

Every builder says “contact us for pricing”. Here is the number.

Move the three settings and see what your house construction in Bangalore costs before you speak to anyone. The full rate card, the exclusions and the payment schedule are all printed below this.

  • Real package rates, not a lead-capture gimmick
  • No email gate — the number is free to look at
  • Confirmed in writing after a free site visit
Or just call: +91 63605 11848

What will my house cost?

Bangalore rates · updated 2026
Plot size1,200 sq ft
FloorsG + 1
Package₹2,250 / sq ft

₹38.9 – 42.1lakh

1,800 sq ftbuilt-up area
₹2,250per sq ft
10 monthsto handover

Indicative only. Built-up area is assumed at 75% of the plot per floor. Your real number depends on soil, setbacks, sanction and the choices you make — we confirm it in writing after a free site visit, and that written figure is the one we sign.

01

Our home construction rate card, printed in full

Four packages. The difference between them is the specification, not the quality of the work — the same engineers and the same trades build all four. Every brand listed below is what actually arrives on site, and the supplier bills come to you.

  • Basic

    ₹2,000/ sq ft

    A sound, honest house. Right for a rental block or a first home where the budget is the real constraint.

    CementUltraTech / ACC
    SteelTATA Tiscon / JSW
    BlocksSolid concrete, 6″
    FlooringVitrified, up to ₹60/sq ft
    Bathroom fittingsHindware / Cera
    WiringFinolex / Polycab
    PaintAsian Paints Tractor
    DoorsFlush, sal wood frames
    Structural warrantyIncluded
    Price my plot
  • Most families choose this

    Standard

    ₹2,250/ sq ft

    The one we recommend for an own-use home. Better finishes where your hands touch them, the same structure underneath.

    CementUltraTech / ACC
    SteelTATA Tiscon / JSW
    BlocksAAC, 8″ external
    FlooringVitrified, up to ₹95/sq ft
    Bathroom fittingsJaquar / Hindware Italian
    WiringPolycab + Anchor Roma
    PaintAsian Paints Apex + Royale inside
    DoorsTeak main, flush internal
    Structural warrantyIncluded
    Price my plot
  • Premium

    ₹2,500/ sq ft

    A clear step up in everything you see and touch, without going fully bespoke. Most upgrade requests land here.

    CementUltraTech / ACC
    SteelTATA Tiscon / JSW
    BlocksAAC, 8″ external
    FlooringVitrified or granite, up to ₹140/sq ft
    Bathroom fittingsJaquar / Kohler entry
    WiringPolycab + Legrand
    PaintRoyale + textured accent walls
    DoorsTeak main and internal, UPVC windows
    Structural warrantyIncluded
    Price my plot
  • Luxury

    ₹3,000/ sq ft

    Architect-led and specified line by line with you. For a house you intend to keep for thirty years.

    CementUltraTech / ACC
    SteelTATA Tiscon / JSW
    BlocksAAC, 8″ + insulation
    FlooringYour choice, budget agreed
    Bathroom fittingsKohler / Grohe / Duravit
    WiringPolycab + Legrand, smart-ready
    PaintRoyale Health Shield + textures
    DoorsTeak throughout, UPVC windows
    Structural warrantyIncluded
    Price my plot

Rates are per sq ft of built-up area and hold for plots inside BBMP limits with normal soil and road access. Rocky soil, deep foundations, a basement or a difficult approach change the number — and we tell you that on the site visit, not after the agreement.

02

And what that number does not include

This is the list most builders save for the final bill. Reading it now is a lot cheaper than discovering it in month seven.

  • Plan sanction and government feesBBMP or panchayat charges, betterment, khata and water or power deposits are paid at actuals. We do the running; the receipts are yours.
  • Compound wall and gateQuoted separately once we know your plot boundary and the level difference at the road.
  • Rock excavation and deep foundationsIf the soil report calls for it, we price it before starting rather than adding it later.
  • Lift, solar and borewellPriced on request. We leave the shaft, the conduit and the plumbing stub ready either way.
  • Loose furniture and appliancesInteriors cover fixed joinery and finishes. Sofas, beds, TVs and white goods stay yours to buy.
  • Landscaping and driveway pavingUsually the last item on a budget, so we keep it out until you decide.
How changes get priced

You will change your mind — everyone does. We price the change in writing, tell you what it does to the completion date, and start only after you approve it. Nothing gets built quietly and billed at the end.

03

You pay for work that already exists

Eight releases, each tied to something you can walk up and touch. No stage falls due on a calendar date, and none of them is due before the work is finished.

agreement signedkeys handed over
  • 10%On agreementDrawings, scope, rates and the completion date are signed first.
  • 15%Foundation completeExcavation, footings and plinth beam cast and cured.
  • 15%Ground floor slab castColumns up, slab poured, curing under way.
  • 15%Upper slab castRepeats per floor if your house has more than one.
  • 10%Blockwork completeAll walls up, door and window frames set to the drawing.
  • 10%Plastering and servicesInternal and external plaster done, conduits and pipes routed.
  • 15%Flooring and finishesTiles, painting, fittings, doors and shutters installed.
  • 10%HandoverReleased after the snag walk, with bills and warranty papers in your hand.

Nothing is released on trust. You, or someone you nominate, inspects each stage before payment. If you are abroad, we do it on a video call and send the dated photos the same day.

FAQ

The questions people actually ask

If yours is not here, call us. We would rather answer it now than after the agreement is signed.

Ask us your question
  • Our packages run from ₹2,000 to ₹3,000 per sq ft of built-up area, and the specification behind each rate is printed openly on this page. What moves your final number is soil condition, foundation depth, setbacks, sanction and the finishes you choose. We confirm the exact figure in writing after a free site visit, and that written figure is the one we sign.

  • It is an honest indication, not a quotation. It uses our real package rates and a standard 75% built-up assumption, so for a normal plot it lands close. Rocky soil, a deep foundation, an awkward road approach, tight setbacks or a basement can move it. The written estimate after the site visit is the binding one.

  • Usually because the specification is thinner, and sometimes because items have been left out of the scope entirely. That is exactly why our rate card names brands. Take the list on this page to any other quote and ask them to fill in the same rows. If they will not, you have learned something useful.

  • Yes. We prepare the architectural, structural and services drawings and help with BBMP or panchayat plan sanction, khata and completion formalities depending on where your plot falls. You stay the applicant, we do the running, and we tell you where the file is sitting. Government fees are paid at actuals and the receipts are yours.

  • Yes, and plenty of our clients do. If you have already taken possession of a flat or built elsewhere, we design and execute only the interiors on the same terms: measurement, 3D views, a line-by-line quote, then execution against a written handover date.

  • A G+1 house on a normal plot usually takes nine to twelve months from the day drawings are approved, and interiors add a few weeks depending on scope. Your programme is written into the agreement at the start, with the stage dates you can hold us to.

  • The completion date sits in the agreement along with the conditions that can extend it — essentially your own changes, approvals sitting with a government office, and weather stopping concrete work. Anything that is our fault stays our problem. If a stage slips, you hear about it in that week’s update, not at the end.

  • Structural work, waterproofing and interior joinery each carry a written warranty period, and manufacturer warranties on fittings and appliances are handed to you along with the bills. The exact periods are listed in your agreement, so nothing depends on anyone’s memory.

CONTACT

Send us the address. We will come and stand on it.

The site visit is free and commits you to nothing. You walk away with the written version of the number you saw at the top of this page, a realistic timeline, and an honest view of what your plot can actually take.

Get the written estimate

Fill this in and we will call you back the same working day with a line-by-line breakdown.

    Loading the form… if it does not appear, call +91 63605 11848 or message us on WhatsApp.

    We use your number only to discuss your project. No marketing calls, and nothing shared with third parties.

    BRAND PARTNERS

    The names that go into your house

    Cement, steel, wiring, pipes, paint and fittings come from brands you already know — the same ones printed on your rate card. The original bills come to you, and nothing gets swapped quietly on site.

    • FinolexFinolex
    • UltraTech CementUltraTech
    • JSWJSW
    • ParrywareParryware
    • MeenakshiMeenakshi
    • ACCACC
    • Tata SteelTata Tiscon
    • Asian PaintsAsian Paints
    • JaquarJaquar
    • PolycabPolycab

    Not a paid endorsement. These are the material brands we buy and install as standard. Where you want a different brand, we price it and put it on your rate card before work starts.